Building notice and order works, Melbourne Building notice? Closed.
A building notice or order from a building surveyor, usually the council's municipal building surveyor, puts the owners corporation on a deadline. Oxide takes it from the first read to the cancellation: we work out what it requires, prepare the response with the engineers and consultants it needs, get the permit, do the works and close it out with the surveyor.




Read.
Every matter in the notice understood, with the dates that matter and who it is addressed to.
Answered.
A show cause response prepared with the engineer and any other consultants, sent before the deadline, with a program the surveyor can hold us to.
Closed.
Permit, works, final inspection and the notice cancelled. The committee gets the paperwork for its records.
How to read a building notice.
Every notice has the same parts. Select one to see what it means and what we do about it.
A formal notice from a building surveyor, usually the council’s municipal building surveyor. It asks the owner to explain why the listed work should not be required. It is not yet an order to do the work.
What Oxide doesWe confirm the type of notice, the section it was issued under and every date that matters.
What it is
Part 1 of 5A formal notice from a building surveyor, usually the council’s municipal building surveyor. It asks the owner to explain why the listed work should not be required. It is not yet an order to do the work.
What usually sets them off.
Notices tend to follow an inspection, a complaint or an incident. These are the matters we see most on Melbourne apartment buildings.
Essential safety measures
Fire doors, exit signs, hydrants and records that aren't kept up. Fixed with your fire services contractor.
Fire safetyBalconies and balustrades
Low or loose balustrades, failed fixings and deteriorating slabs. Engineered, permitted and rebuilt.
StructureCombustible cladding
Panels identified in an audit. Replaced to the fire engineer's design under a building permit.
FacadeCracking and movement
Walls, slabs and masonry moving. Investigated with the engineer before anything is repaired.
StructureUnauthorised works
Past alterations without a permit. Documented, regularised or removed, as the surveyor requires.
ComplianceDangerous parts of a building
Loose render, falling masonry or failed roofing. Made safe first, then repaired.
SafetyFrom notice to cancellation.
The same six steps on every notice, with the owners corporation told where things are at each one.
Read the notice
We confirm what kind of notice it is, every matter it raises, the response date and whether lot owners have been issued their own.
Inspect and investigate
Each matter inspected on site. The structural, fire or forensic engineer, or another consultant such as a designer or draftsperson, is engaged where the notice needs their evidence.
Respond
A written show cause response with the proposed works and a realistic program, sent before the deadline. If more time is needed, we ask for it with reasons.
Quote and approve
An itemised quote for the committee, one line per matter, so every item in the notice is visibly covered.
Permit and works
Building permit issued, mandatory inspections booked, trades on site under one supervisor, residents kept informed.
Inspect and cancel
Final inspection passed and the notice cancelled. The certificate and records go to the strata manager for the owners corporation's file.
Deadlines, appeals and disputes.
The dates on the notice
A building notice under the Building Act 1993 (Vic) states how long the owner has to show cause. Read the dates first and diarise them: a notice that isn't answered properly can be followed by a building order.
Appeals
Appeals against building notices and orders are heard by the Building Appeals Board, within the time the law allows. If you think a notice or order is wrong, get advice from a lawyer or building surveyor early, before that time runs out.
Who pays inside the building
Common property matters usually sit with the owners corporation, and matters inside a lot with that owner. If they disagree about who pays, VCAT hears owners corporation disputes.
General information only, not legal advice. The notice, your building surveyor and your lawyer are the authority on your case.
Send us the notice.
Upload it as it arrived. We'll read it, tell you what it requires and what the deadline means, and come back with the next step.
Notice questions.
Step by step, from the notice arriving to cancellation: read the guide.
What's the difference between a notice and an order?
A building notice asks the owner to show cause why work shouldn't be required. A building order directs the work to be done. A notice that isn't answered properly can be followed by an order.
Can the deadline be extended?
The surveyor can allow more time where there is good reason, such as engineering or design work, or a permit, that takes longer. We prepare that request with a program showing when each matter will be done.
Who pays for the works?
Common property items usually sit with the owners corporation, and items inside a lot with that owner. We scope them separately so each party can see their share.
Will we need a building permit?
Most notice works do. We engage the building surveyor and put the permit and every mandatory inspection on our program.
24/7 strata after-hours.
For common property emergencies, call any time. A trade is on site within 2 hours across metro Melbourne, and the strata manager gets a written report the next morning.