What a building notice is
A building notice is a formal notice under the Building Act 1993 (Vic), usually issued by the council's municipal building surveyor. A private building surveyor can also issue one for a building they are appointed to. It lists matters the surveyor is concerned about, such as a balustrade that is too low, fire doors that don't close or cracking that could affect safety, and asks the owner to show cause why the work to fix them should not be required.
It is not yet an order to do the work. That distinction matters, because it is the stage where the owners corporation still has room to respond, explain what has already been done, and agree a sensible way to fix the rest.
Who it's addressed to
In an apartment building the notice is usually addressed to the owners corporation, care of the strata manager. Individual lot owners can also receive their own notices for matters inside their lots, so it is worth confirming early who has received what.
Read the list of matters carefully. A single notice often mixes common property items with items that belong to particular lots.
Every matter in the notice needs an answer, even if the answer is that it's already fixed.
The deadline
The notice states the period the owner has to show cause in writing. If the response isn't made, or isn't accepted, the surveyor can follow it with a building order, which directs the work to be done and leaves less room to agree how.
If the work needs more time, for example because an investigation by an engineer or other consultant, or a building permit, is required, the surveyor can be asked for an extension. Send that request with a program showing when each matter will be done.
We'll read it, tell you what each matter requires and what the deadline means, and come back with the next step.
Send us the noticeThe six steps from notice to cancellation
- Read the notice. Confirm the type of notice, every matter and every date.
- Inspect and investigate. Each matter inspected, with an engineer or other consultant where evidence is needed.
- Respond. A written response with proposed works and a realistic program, before the deadline.
- Quote and approve. An itemised quote for the committee, one line per matter.
- Permit and works. Building permit, mandatory inspections, works under one supervisor.
- Inspect and cancel. Final inspection, the notice cancelled, and the records filed.
Questions to ask before you approve the works
- Does every matter in the notice appear as a line in the quote?
- Which items are common property and which belong to lots?
- Does the work need a building permit, and who is the building surveyor?
- Is an engineer or other consultant involved, and has their advice shaped the scope?
- What is the program, and does it fit inside the time the surveyor has allowed?
General information only, not legal advice. Your strata manager, building surveyor or a lawyer can confirm how the Building Act 1993 applies to your building.