Cladding rectification, Melbourne Combustible cladding out.
Expanded polystyrene, aluminium composite panels and other combustible cladding, removed and replaced with a non-combustible system to the fire engineer's design. Oxide runs the whole job: audit findings, engineers and consultants, permit, scaffold or swing stage, residents, and the certificate at the end.




Audited.
The audit or fire engineer's report read line by line, every affected elevation mapped before anything is priced.
Replaced.
Panels stripped and a non-combustible system installed to the engineer's design, one elevation at a time.
Certified.
Mandatory inspections passed, the building surveyor's final certificate issued, records handed to the owners corporation.
Drag through the job.
One elevation from audit to certificate. Pull the tape to move the program and see who is on site at each stage.
Audit
Strip
Install
Certify
The non-combustible system installed to the fire engineer’s design, with fixings to the structural engineer’s detail.
What comes off. What goes on.
The new system is specified by the fire engineer and approved by the building surveyor. We build exactly that, and document it.
Combustible
Coming off- Aluminium composite panelsACP
- Expanded polystyrene renderEPS
- Other combustible liningsAs audited
Non-combustible
Going on- System to the fire engineer's designSpecified
- Fixings checked by the structural engineerEngineered
- Inspected at every mandatory stageCertified
People
still
live here.
On most cladding jobs residents stay in their homes. Access, noise, windows and balconies are planned elevation by elevation.
Notice before every stage. Residents know which side of the building is affected and for how long.
Access kept open. Entries, car parks and paths of travel protected or diverted, never blocked without warning.
One supervisor on site who residents, the strata manager and the committee can all talk to.
Cladding questions.
How do we know if our cladding is combustible?
An audit or a fire engineer's assessment confirms it. If you already have a report, send it to us and we'll explain what it means for the building and the order works should happen in.
Can residents stay during the works?
In most buildings, yes. Works are staged by elevation, and residents are told before each stage which windows and balconies are affected.
Is there funding for cladding rectification?
Cladding Safety Victoria was wound up in 2026 and its rectification program now sits with the Building and Plumbing Commission (BPC). If your building was in the program, check its status with the BPC. Funded or owner-funded, the work runs through the fire engineer, a building permit and the surveyor.
Do the works need a building permit?
Yes. We engage the building surveyor, book every mandatory inspection and hand the final certificate to the owners corporation.